Case Study

DC Water Lead Service Line Replacement, Packages 18 & 19

Lead pipe replacement, house connections and traffic control for Murphy Pipeline Contractors on DC Water Packages 18 and 19, 2024 to 2026.

Project Details

Overview

R&R Contracting's Murphy Pipeline subcontract on DC Water Packages 18 and 19 covers lead pipe replacement, house connections and traffic control.

Location

Washington, DC

Client

Murphy Pipeline Contractors for DC Water

Summary

Under a subcontract with Murphy Pipeline Contractors, R&R Contracting provided pipe crews and traffic control for DC Water's Lead Service Line Replacement Construction Packages 18 and 19 in Washington, DC. R&R's work on the packages ran from October 2024 to June 2026.

About the Project

Packages 18 and 19 belong to Lead Free DC, DC Water's program to replace every lead service line in the District by 2030.

R&R's Scope

  • Removal and replacement of lead pipe
  • Residential house connections
  • Test pits
  • PCC pavement repair
  • Seeding and sodding
  • Traffic control: a three-person crew of two flaggers and a supervisor, with trucks, paddles and directional signage

Crews included laborers, pipe layers, operators and truck drivers.

Project Team

  • Owner: DC Water
  • Contractor: Murphy Pipeline Contractors
  • Pipe crews and traffic control: R&R Contracting
R&R Contracting construction crew
R&R Contracting construction crew
20

Project Duration in Months

54

Workers Placed

$5M

Contract Value

Related Projects

DDOT Cleveland Park Utility Test Holes

Washington, DC

Skilled laborers for engineering firm A. Morton Thomas and Associates on DDOT's Cleveland Park utility test holes, Connecticut Avenue NW, early 2026.

A. Morton Thomas and Associates logo
Client
A. Morton Thomas and Associates for DDOT
R&R Contracting construction crew
Certification

Certified Across Five States

R&R Contracting holds certifications that reflect our commitment to diversity and minority participation. These designations enable prime contractors to meet federal and local participation requirements on DOT-funded and government projects.

Let’s work together