For MWAA's E-Line sanitary sewer improvements at Washington Dulles International Airport, R&R Contracting provided laborers to Anchor Construction.
Dulles, VA
Anchor Construction for the Metropolitan Washington Airports Authority
Summary
At Washington Dulles International Airport, R&R Contracting provided laborers to Anchor Construction on the Metropolitan Washington Airports Authority's E-Line Sanitary Sewer System Improvements. Anchor holds the contract in a joint venture with Stacy Witbeck. R&R's work is on record from May 2025 to June 2026.
About the Project
The job adds about 4,900 feet of new 36-inch PVC sanitary sewer at the airport and rehabilitates about 3,800 feet of existing line.
R&R's Scope
General laborers for Anchor Construction.
Project Team
- Owner: Metropolitan Washington Airports Authority
- Contractor: Stacy Witbeck–Anchor Construction joint venture
- Laborers: R&R Contracting, for Anchor Construction


Project Duration in Months
Project Crew Size
Contract Value
Sparrows Point Container Terminal DMCF
Edgemere, MD
A four-person R&R Contracting crew installed erosion and sediment controls for Allan Myers at the Sparrows Point Container Terminal DMCF in 2026.


Certified Across Five States
R&R Contracting holds certifications that reflect our commitment to diversity and minority participation. These designations enable prime contractors to meet federal and local participation requirements on DOT-funded and government projects.
Let’s work together