Overview
The same R&R Contracting crew worked both of J. Fletcher Creamer & Son's Patriot Ridge jobs on the Army post at Fort Meade.
Fort Meade, MD
J. Fletcher Creamer & Son for Fort Meade American Water
Summary
On Fort Meade's Patriot Ridge C and D jobs, R&R Contracting provided a utility crew to J. Fletcher Creamer & Son, the prime contractor for Fort Meade American Water. The work ran from December 2025 to October 2026 under prevailing wage, with certified payroll reported through LCPtracker.
About the Project
American Water owns and operates the water and wastewater systems on the Army post at Fort Meade under a 50-year contract.
R&R's Scope
- Laborers and skilled laborers
- A power equipment operator
- On Patriot Ridge D, a flagger
The same R&R crew worked both jobs.
Project Team
- Owner: Fort Meade American Water
- Prime contractor: J. Fletcher Creamer & Son
- Utility crew and flagger: R&R Contracting


Project Duration in Months
Project Crew Size
Contract Value
Glebe Road Bridge CE0041 Rehabilitation
Earleville, MD
Two R&R Contracting general laborers worked for Allan Myers on the Cecil County Roads Division's Glebe Road Bridge CE0041 rehabilitation in Earleville.


Certified Across Five States
R&R Contracting holds certifications that reflect our commitment to diversity and minority participation. These designations enable prime contractors to meet federal and local participation requirements on DOT-funded and government projects.
Let’s work together